Tottenham Stadium
Smyth Steel fabricated and erected 800 tonnes of steelwork which was assembled into a number of individual roof cassettes. These were then transported to the cladding contractor to clad off site before erection. We fabricated and supplied contractor designed bearings from which the roof was suspended.